Equip yourself with a tape measure and spread it cross the bottom of the wall your about to furr out.
How to fur a concrete wall.
Determine the desired position of the furring strips or 2x4s before drilling any holes.
Tapcon concrete screw installation.
With a pencil or a marker draw vertically lines from.
Determine spacing and location of furring strips.
Use chalk to draw the lines and a straight edge as a guide.
Step 2 place the first furring strip over a vertical line.
Mark the cinder block wall every 16 inches vertically and then every 16 inches horizontally to form a grid pattern.
You can t deny that concrete walls are efficient.
Make exact measurements ensure.
How to frame poured walls.
Mark the wall for vertical furring strips installed 16 inch on center.
These markings will indicate where you will vertically attach your.
Pre drill the holes in the furring strips so they do not crack when.
Using the level plumb down the wall and draw a line for reference.
Clear the holes of all.
Now repeat this process at the top of the wall.