An alternative to gluing your paneling directly to the walls is to glue wooden studs to the walls and then attach the paneling to the studs.
How to glue drywall to concrete block wall.
How to adhere drywall to a concrete block 1.
The strips should be roughly 16 to 24.
One common technique is to cover the block wall with drywall.
Using a scraper scrape off chunks of debris from the wall to make it as smooth as possible.
Measure the height of the wall from floor to ceiling.
Cut enough furring strips from 1 by 3 inch lumber with a circular saw to allow you to space them 16 inches apart for.
Here are some tips to.
Determine where you will install furring strips along your block walls.
How to attach drywall to concrete block step 1.
Make marks on the wall that are 16 inches apart starting at one end and working toward the other.
Add some rigid board insulation between the hat.
Center a strip.
Trim each strip with a circular saw to match these.
The hat channel image 1 should be attached to the wall using concrete nails and concrete nail gun images 2 and 3.
You can use standard 2 x 4 boards and strong adhesive to create a wooden framework to which you can easily attach your paneling.
Cut the nozzle end of a tube of construction adhesive at a 45 degree angle using a utility knife.
Want the block wall in your basement to have a more finished appearance.
Frame out the rest of the wall by adding faux top and sole plates dropping the top a bit for a drop ceiling if.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
Find a mark for.