Lag bolts aka lag screws are fasteners with flat hexagonal heads and threaded cylindrical shafts.
How to hang projector screen on the wall.
One side attaches to the wall the other permanently affixed to the projector screen frame.
It depends on what you decide to use.
Attach the cleat to the projector screen frame measure down off of the top of the frame about 12 16 and make a mark.
Drill a hole for the hook screw or toggle bolt with wall hooks.
Lift the screen and attach the bracket connectors to.
If there are no joists available in the location where you.
You may need to use shims between the frame and wall in order to achieve a plumb screen.
You should drag the stud detector over the wall upon which.
How to hang a projector screen on the wall first step.
Attach one side of the projector screen to the screw in the wall and then raise the other side to be level with the floor using a bubble level tool to make sure that it is level.
Measure on the wall the distance between the screen s bracket connectors.
To use a stud finder you simply run it along the wall until its indicator tells you that it s hit a stud.
Carry the line from end to end using a speed square.
Fourth re mount the frame now with screen attached and double check horizontal level and plumb.
Simply screw a 3 long screw in to the wall at your desired height and preferably in to a stud in the wall.
We will require a stud detector for this step.