Mark the clip bracket fixing holes and screw one screw into the wood for the chalk line.
Install rain gutter drain pipe.
Cover the tube with fabric.
Pour a bag of pea gravel into the hole.
At the side furthest from the drain hold a gutter clip bracket against the fascia board in a position where if the gutter was present it would be just below the edge of the roof tiles.
Make sure the tube slopes to drain the.
Before digging call 811 to have utility lines marked.
Slip the fabric sock over the tubes leaving a few inches at each end to overlap the.
How to install pvc pipe for drainage step 1.
Measure the depth of your trench using a line level.
Installation of gutter drain including downspout and hdpe triple wall pipe.
Start from the location of the down spout on the gutter system and mark the desired path of the pvc drainage.
Dig a hole two to three feet deep under the end of the sewer pipe using handheld posthole diggers.
The easiest way to dig the.
Connect the drain tube slope the trench to ensure proper drainage.
Smooth out the bottom of.
Pound a stake in near.
Underground gutter drainage step 1.
Assemble and place the catch basin.
This provides drainage for the water that runs off the.