Warm roof construction is the easiest method and is often cheaper.
Installing a warm flat roof.
How to install a warm deck roof duration.
Cure it grp roofing system 75 410 views.
Roofing timber steel joists plywood exterior covering such as epdm or modified bitumen water based adhesive foam with fibreglass backing insulation warm flat roofing.
At least 100mm of rigid board insulation must be positioned on top of the vapour control layer the vapour control layer stops any moisture within the building contaminating the insulation.
Warm flat roof vapour barrier insulation explained duration.
The 8 step process for diy installation step 1.
The key to the two different methods is the way in which the insulation is installed.
In addition you will still need tools such as a measuring tape drill and utility knife along with the following.
Frame the roof one important and perhaps not so obvious fact is that a flat roof is not actually flat.
In a warm roof the insulation is laid on top of a moisture or vapour barrier directly onto the flat roof deck which means that the insulation is continuous.
Flat roof construction can come in the form of a warm roof or cold roof depending on the requirement of the owner and architect as they relate to the building regulations regarding heat loss and insulation.