Fasten bevel siding in place using one nail per bearing or stud spaced a maximum of 24 inches on center.
Installing beveled cedar siding.
Take care not to nail through the overlap of two pieces see figure above.
Take care not to nail through the overlap of two pieces.
Reduce total project cost by having multiple vendors bid on the same detailed work specification of your cedar bevel siding project.
It is normally blocked out with a starting strip the same thickness as the top of the siding board see figure a.
Bevel siding should be face nailed to studs with 1 1 2 in.
Each succeeding course overlaps the upper edge of the lower course.
How to install cedar bevel siding 1.
On rabbeted bevel siding leave a 1 8 inch expansion clearance.
Siding should be nailed to each stud or on 16 inch centers.
Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board.
Fasten a cedar starter strip.
The nails we are using f.
In those areas where an air space between siding and sheathing is desired nail siding to furring strips table 4.
Siding may be installed starting with the bottom course.
Do not reduce the siding overlap recommendations given in the installation sections of this publication.
Penetration into solid wood using one nail per bearing spaced at a maximum of 24 in.
Save on installation costs by combining similar jobs and by being willing to have your project completed during low demand periods for the vendor installer.
Wrap the house with a polyethylene or similar moisture barrier stapled to the wooden wall sheathing with a.
Place nail just above the 1 in.
Horizontal siding installation siding should be nailed into studs at maximum 24 in centers when applied over wood based solid sheathing and 16 in.
Each succeeding course overlaps the one below.
For bevel siding this is a minimum of 1 inch.
How to install cedar weatherboards sort of i love working with cedar it smells good it s easy to handle and it looks awesome.
On center when bevel sidings 11 16 or thinner are applied without sheathing.
Butt joints between boards should be staggered and made on studs.
Intricate layouts and careful material matching will result in installation costs near the high end of the estimated range.
Place nail just above the overlap.