Hold the strip against.
Installing board and batten siding over brick.
The next panel will fit over the edge of the previous one disguising the nailing strip and lock securely into place.
Before you begin cover the sheathing with building wrap and install trim boards and flashings.
Here are four methods to do the job right.
Mark the length of the brick wall with chalk every 24 inches.
Like many types of siding you ll start installing the board and batten panels from one side.
There are many ways to nail board and batten siding.
Barns and houses with board and batten siding were inspired by nordic european buildings and gained popularity in america sometime around the middle of the 19th century.
There are two options for this.
Secure these boards using fasteners fasteners placed at the center of the siding boards.
Board and batten can be installed onto solid plywood or osb sheathing.
How to install hardiplank over brick.
The main concern to understand is that the hardieplank siding is going to be on the house for.
If your sheathing is not solid you will need to first attach horizontal furring strips.
When remodeling over existing wood siding you must apply rigid foam or fiber sheathing shimming if necessary to create a level surface.
Attach a 2 by 2 inch wood furring strip to the walls centered on each of the chalk marks.
If addi onal insula on is required then apply rigid foam or fi ber sheathing.
Traditionally board and batten siding starts with wide vertical planks boards which are then joined together by thin vertical strips battens to cover the seams.
Use a tape measure to measure the distance between each needed mark.
Creating a balanced wall.
Battens which he says he ll finish with a high quality stain.
Top and bottom j channel.
For example to install a board and batten wainscoting 32 inches high using 1 4 boards spaced 12 inches apart for instance and installing a horizontal top board and a baseboard of the same.
With a helper expect to spend a day installing 800 square feet of siding.
Centering the fasteners allows the boards to expand and contract without bowing or splitting see diagram below.
Apply 1 x 3 wood furring strips horizontally 14 on center to create a level surface.
His plans call for 9 1 2 in.
To install board and batten siding start with installing wide vertical boards spaced approximately one board width 7 8 apart.
If installing over concrete block poured concrete or brick siding must be installed over 1 x 3 furring strips.
Remove the siding and install oriented strand board commonly referred to as osb or to use the existing siding that s on the house now as substrate or layer beneath the top surface underneath the hardieplank siding.