Some say putting two nails in the boards can cause them t0 crack over time.
Installing cedar board batten siding.
Here are four methods to do the job right.
Place the skirt board at the bottom of where the siding will end and make sure it s level before moving onto the next steps.
Installation of cedar board and batten siding 1.
Prepare the walls as you would for other wood sidings by applying building wrap self stick flashings at the.
The next panel will fit over the edge of the previous one disguising the nailing strip and lock securely into place.
Like many types of siding you ll start installing the board and batten panels from one side.
Install water table boards.
Install overlying battens typically 2 to 4 battens cover the gaps between the boards and hold the edges of.
With wider boards increase batten overlap proportionately.
For nominal 6 inch boards spaced inch apart battens should overlap by a least 1 2 inch.
Line up the panel with the edging and use screws to secure it in place on the nailing strip.
How to do it prep walls.
I had planed on a spacing of about 0 75 between boards.
While installing vertical board and batten siding has many similar steps to its horizontal cousin there are 5 key steps to keep in mind when applying this exterior cladding product to your home s exterior.
On each wall measure.
This is particularly important for vertical installation.
Installing board batten siding board and batten is a vertical pattern created using cedar boards and battens of various widths for a wide range of appearances.
Traditional board and batten siding described in layered steps.
Install wide vertical boards typically 6 to 12 space 1 2 to 1 between boards to allow natural movement between.
If needed install horizontal furring strips every 12 or a solid nail able sheathing prior to the siding.
His plans call for 9 1 2 in.
There are many ways to nail board and batten siding.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
This action will help to level the surface and provide sufficient material for 3 4 fastener penetration.
Writing to fine homebuilding s breaktime forum wenws is looking for some advice on the best way to finish the board and batten siding for his new house.
All around the house install a 1x6 or wider water table with its bottom edge 2 inches below.
Before starting the vertical board installation install a skirt board a board that s wider than the siding boards.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
Establish your base line.