Secure the cable to the shingle with one of the provided cable clips.
Installing heat trace on roof.
Here are the basic steps for installing new heat cable along a roof eave and gutter.
Install roof heater cables when it s dry outside and it s safe to do the work from a ladder.
Run the cable back.
If you don t have a gfi grounded outlet you may need to hire an electrician to put one close by.
For roof drains leading into a heated area a loop of heating cable is installed to a typical depth of 2 feet.
Always make sure that your installation is thermally insulated and weatherproofed according to the requirements of your particular application.
Take one end of the cable and begin at the corner of your roof.
Metal roofs over air plywood or insulation should be added under the eave.
When installing roof and gutter heat trace on a commercial building there are several key considerations to ensure proper installation.
For dome drains on roof trace the roof around the dome drain in a 5 pointed star pattern about 18 inches out from the center of the dome then enter the drain about 2 feet and come back out of the drain.
Step 1 apply shingle clips to install roof heating cables you must first apply shingle clips to the structure.
Membrane roof pv tpo epdm etc use belt loop approach attach with adhesive.
There is more to heat trace than meets the eye.
How to melt ice and snow on your eaves an.
How to install heat tape deicier cable on your roof for eaves and gutters and downspouts for snow and ice removal.
Use a run of heater cable in the gutter.
Refer to page 8 for design options standard 4 6 gutters use 1 run of heat trace cable in gutter.
Clip the starting point of the cable to a.
Route the cable from the electrical outlet to the starting point on the roof.
Do not clamp the heating cable with the support but place the heating cable over the support.