Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
Installing liberty roll roofing.
Liberty roofing systems are applied without torches open flames hot asphalt or messy solvent based adhesives.
The roofing screws were 1 1 2 inch and went thru the drip edge and into the stud below.
Do not use the eaves as a guide instead because they can be uneven.
Snap a chalk line as a guide for the first layer roofing.
You can install metal valley flashing but it is common to simply apply an 18 inch wide strip of roll roofing instead.
Learn more about common installation practices for low slope residential applications including why owen corning deckseal roofing system is a preferred choice.
Prime the face on the roof and allow to dry before installing cap sheet.
Over the base sheet in a 1 8 bed of cement and stagger nail with two rows of roofing nails 3 o c.
A self adhering roofing system will provide long lasting protection for the low slope areas of your property without the danger or hassles associated with the installation of other conventional roofing products.
Puting the weather watch rolled roofing material on was real easy and fast to install.
Roll out and position full width 39 3 8 sheets with the selvage edge on the high side of the roof.
This video demonstrates process of installing libert.
Gaf hágase un experto en techos capít.
Learn about the liberty sbs self adhering base ply sheet.
Install drip edge flashings roofing felt and wsu if needed.
The roof area is 14 ft.
Set it in a bed of roofing cement smooth out any creases and drive nails near the edges.