Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Installing metal roof edging.
Add the metal panels.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Place the piece of edging on.
If it doesn t pull the drip edge out slightly from under the shingles.
Step by step install drip edge on a metal roof build the lower rim of roof extended away from the fascia.
Make sure the outer edge extends over the gutter.
Here is a short video showing how.
Install the roofing screws vertically along each rib in the panel.
How to install a drip edge.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
The edging or eave flashing consists of metal strips that are used to cover the perimeter of.
Position a piece of 2 by 2 inch metal roof edge at the lower edge of the roof with the beveled side against the.
Secure the drip edge with roofing cement.
Place the first screw.
Always begin working at the point with the longest peak to eave distance.
Fix the problem by installing sheet metal drip edge also called drip cap which is available at lumberyards and home centers.
Take your first sheet.
Install sheet metal drip cap over the lower rim.
How to install a metal roofing edge 1.
Move the piece as necessary so one end extends 16 inches beyond the lower corner of the roof at one side.