How to install a metal roofing edge 1.
Installing metal roofing which edge is out.
Take your first sheet of.
Measure one panel width in from the roof edge.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Add the metal panels.
Place the first screw.
The edging or eave flashing consists of metal strips that are used to cover the perimeter of the roof.
To watch the entire series from the beginning click here.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame.
Always begin working at the point with the longest peak to eave distance.
To install corrugated roofing start by cutting your panels to length with an angle grinder.
Use your 1 1 4.
You will need to order enough metal material to cover the entire roof and this process.
Measure the roof area.
Install the roofing screws vertically along each rib in the panel.
Place the leading edge of the first panel along this line.
Cut the entire drip edge by your second mark so that it only hangs past the edge by an inch.
You ll want to order metal panels that are an appropriate color and look to complement your.
At this point chalk a line from ridge to eave.
Beginning at the outside edge of your roof place each panel directly onto the purlins that are attached to the roof trusses.
Then bend in the.
Position a piece of 2 by 2 inch metal roof edge at the lower edge of the roof with the beveled side against the.
Move the piece as necessary so one end extends 16 inches beyond the lower corner of the roof at one side.
Install the drip edge as normal.
When you reach a corner where an eave and rake edge meet you need to make a cut to ensure a proper fit.
Next pre drill holes on the end and side ridges of the panels spacing the holes 6 to 8 inches apart.