However t1 11 should never actually be installed flush with the ground as this contact can increase moisture buildup and promote mold growth.
Installing t1 11 siding house.
T1 11 siding provides a paneled look for sheds barns and some houses.
The siding comes in 4 foot by 8 foot panels that install vertically.
Each type of t1 11 siding has a 3 8 inch thick edge designed to be overlapped by the next panel installed.
The edges should be placed over a stud and then nailed into position together.
Place your t 111 siding on the saw horses for easy handling and cutting.
How to install t 111 siding.
Hook your tape measure to an outside corner edge of your framing.
Remove all excess wood nails and debris from your studs where you will be installing t 111 siding.
Prime all four edges of each sheet before you hang it as a safeguard against moisture damage.
When t1 11 is installed on a two story structure or when.
Unlike natural hardwood sidings wherein painting or staining isn t always needed t1 11 sidings need to painted or primed at the time of installation this is an unavoidable installation and maintenance expense.
T1 11 siding can be installed using 1 5 8 inch exterior screws or 12d galvanized nails and it s best to start from the bottom up to achieve a clean seamless application.
Make sure you weather proof the siding.
If you paint it giving it.
Paint or stain the wood making sure the siding is well protected and won t succumb to any of the harm that outside moisture can cause.
Issues with t1 11 siding installation repairs please note that t1 11 siding is sold in the untreated form.