Yes even flat roof to wall intersections are not being properly done.
Intersection of wall and roof waterproofing.
The flat roofing material must go up the wall a minimum of 12 or up the wall and over the top of the wall if the wall is less than 12 high.
The omittance of the termination metal leaves an opening at the top of the coping and allows for moisture infiltration at the space between the parapet wall and the structural wall.
Figure 79a flashing the junction step 1.
Step 2 flashing 2 covers both the apron flashing upstand and the wall underlay.
Proper roof wall flashing example.
82 build supplement flashings section 4 roof wall intersections figure 79b step 2.
Unauthorized entry shall be restricted to the waterproofing areas.
Flashing provides the extra protection these spots need.
These problem areas include the edges of skylights and chimneys soil stacks vent fans and roof valleys as well as the intersection of the roof deck and dormer walls.
Typical waterproofing details of foundations above the roof slab shall be followed as per approved shop drawing.
The installer tacked a row of asphalt shingles to the wall caulked their top edge and hoped for the best.
The most common mistake at this intersection is to allow the metal coping to but up to the wall without the application of termination metal.
A vertical structure through the roof that ventilates smoke and combustion gases from a fireplace boiler or stove to the outside atmosphere.
A waterproofing seal installed at the intersection of the roof and chimney and used to prevent moisture penetration.