How To Install Drip Edge Flashing On Roof

Pin On Are Bdcs

Pin On Are Bdcs

How To Roof A Shed Roofing A Shed Drip Edge Roofing Installing Roof Shingles

How To Roof A Shed Roofing A Shed Drip Edge Roofing Installing Roof Shingles

T Style Drip Edge Corner Install Jpg 800 X 600 100 Drip Edge Roof Drip Edge Roof Installation

T Style Drip Edge Corner Install Jpg 800 X 600 100 Drip Edge Roof Drip Edge Roof Installation

Roof Drip Edge Ii Metal Roof Installation Roof Installation Metal Roof

Roof Drip Edge Ii Metal Roof Installation Roof Installation Metal Roof

Pin On Roofing

Pin On Roofing

How To Install Drip Edge On Shed Roof Drip Edge Shed Roof Roof Edge

How To Install Drip Edge On Shed Roof Drip Edge Shed Roof Roof Edge

How To Install Drip Edge On Shed Roof Drip Edge Shed Roof Roof Edge

How to install drip edge flashing on a roof hunker.

How to install drip edge flashing on roof.

How to install drip edge flashing to a new roof to install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first. Select enough lengths of flashing to cover it. 4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint. Be sure to tuck the drip edge under the starter strip and felt paper.

Slide the corner tight to the fascia. The drip edge should be installed on top of the underlayment at all rakes and below or on top of the underlayment at the eaves. At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required. Measure the length of the eave you need to cover with drip edge using a tape measure.

You may need to nail through the starter strip into the drip edge. Gaf mastering the roof chapter 05 the drip edge is critical to provide a finished look and to add waterproofing. Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of. While the vertical leg should be placed 1 4 1 2 away from the fascia.

The starter course is comprised of a shingle that s roughly half the width of the field shingles. Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge. The roof leg should extend a minimum of 2 back onto the roof sheathing. Install the starter course.

This will allow for expansion and contraction and prevent buckling. Learn more about drip edge at.

Pin On Wood Road

Pin On Wood Road

Installing Drip Edge On A Hip Roof Metal Roof Installation Hip Roof Drip Edge

Installing Drip Edge On A Hip Roof Metal Roof Installation Hip Roof Drip Edge

Pin On Home Improvement

Pin On Home Improvement

Standing Seam Metal Roofing Installation Publications By New England Metal Roof Metal Roof Installation Metal Roof Roof Installation

Standing Seam Metal Roofing Installation Publications By New England Metal Roof Metal Roof Installation Metal Roof Roof Installation

Source : pinterest.com